MINOR RENOVATION WORKR FOR HDB 5ROOM FLAT.
-1. Dismantle and dispose off of existing full height TVstorage cabinet & fix 1 lot 200.00$
敲掉现有电视墙 重新走线200块
-2. Supply & construct 4ft L x 7ft H aluminum bi-foldglass door c/w heavy-duty, overhead sliding track, concealed door handle,stopper & clear glass panel for kitchen entrance. 1 unit Ls 950.00$
给厨房进口处安装一扇aluminumbi-fold glass 的门950块 (貌似有点贵)
-3.Supply labour to dismantle, disposal & replaces newsliding/swing door 2 sets Ls 1,000.00$
给两个卧室现有的2个Built-in衣橱换柜门1000块 (好贵!我在想要不敲了买IKEA新的了)
-4. Supply labour to replaces toilet sitting bowl for 2toilets. (supplied by owner). 2 units Ls 200.00$
换两个马桶人工费200块(马桶自己买)
-5. Supply labour to replaces wash basin & tap forc/toilets. (supplied by owner).1 unit Ls 100.00$
换一套洗脸槽和水龙头(东西自己买)人工费100块
-6.Painting for whole house internal areas for all wall& ceiling area. using ICI/Nippon paint c/w 5+1 colour 1 lot Ls 1,580.00$
粉刷整个屋子1580块
-7.Supply labour & materials to polish existing marbleflooring for living/dining & passageway area.1 lot Ls 700.00$
客厅大理石地板抛光700块(贵么)
-8.Supply labour & materials to sand & re-varnishexisting parquet flooring for 3 bedrooms 1 lot Ls 800.00$
三个卧室木地板清理上漆800块
-9. Chemical acid washing for kitchen, 2 toilet &general cleaning for whole house. 1 time Ls 200.00$
化学清洁厨房厕所及打扫整屋200块 (有人做过这个么)