polish & re-varnish marble floor for 1 hall & 2 bedrooms $ 800.00,磨地太贵了
登录 | 论坛导航 -> 华新鲜事 -> 房产车市 | 本帖共有 2 楼,分 1 页, 当前显示第 1 页 : 本帖树形列表 : 刷新 : 返回上一页
<<始页  [1]  末页>>
作者:zhww_goodmood (等级:2 - 初出茅庐,发帖:93) 发表:2010-04-08 10:10:15  楼主  关注此帖
一个装修商的quotation, 请大家看看哪些水分比较多? ITEM DESCRIPTION AMOUNT A Works Descriptions 2 To supply & adding another door step at main entrance c/w matching tiles $ 120.00 3 To supply & overlay floor tiles at master toilet $ 450.00 4 To supply and install 1 set of aluminium main gate $ 420.00 5 To supply and install normal hollow core wooden main door c/w lockset & stopper $ 450.00 6 To supply and install 1 no of wash basin c/w tap & outlet piping $ 210.00 7 To supply and install 1 no of wash basin c/w tap & outlet piping at kitchen $ 210.00 8 To provide labour only to install towel hanger & mirror at 2 toilets $ 60.00 9 To supply & install to replace a toilet bowl at master toilet $ 300.00 10 To provide labour only to remove 1 no of wash basin from common toilet $ 40.00 11 To supply & install aluminium frame arcrylic panel sliding door at (more...)
polish & re-varnish marble floor for 1 hall & 2 bedrooms $ 800.00,磨地太贵了
1:For item 2: To supply & adding another door step at main entrance c/w matching tiles $ 120.00
可以让contractor做好step,然后自己买tiles,让contractor粘上去,这样的话价钱应该会省点

2:For item 3: To supply & overlay floor tiles at master toilet $ 450.00 觉得overlay 有点贵

3:For item 17: To polish & re-varnish marble floor for 1 hall & 2 bedrooms $ 800.00,磨地太贵了
欢迎来到华新中文网,踊跃发帖是支持我们的最好方法!原文 / 传统版 / WAP版所有回复从这里展开收起列表
作者:zhww_goodmood (等级:2 - 初出茅庐,发帖:93) 发表:2010-04-09 15:38:01  2楼
一个装修商的quotation, 请大家看看哪些水分比较多? ITEM DESCRIPTION AMOUNT A Works Descriptions 2 To supply & adding another door step at main entrance c/w matching tiles $ 120.00 3 To supply & overlay floor tiles at master toilet $ 450.00 4 To supply and install 1 set of aluminium main gate $ 420.00 5 To supply and install normal hollow core wooden main door c/w lockset & stopper $ 450.00 6 To supply and install 1 no of wash basin c/w tap & outlet piping $ 210.00 7 To supply and install 1 no of wash basin c/w tap & outlet piping at kitchen $ 210.00 8 To provide labour only to install towel hanger & mirror at 2 toilets $ 60.00 9 To supply & install to replace a toilet bowl at master toilet $ 300.00 10 To provide labour only to remove 1 no of wash basin from common toilet $ 40.00 11 To supply & install aluminium frame arcrylic panel sliding door at (more...)
请教授和同学们分析这个quotation, 磨地怎么这么贵,我也想知道价钱是否公道?
对装修一点概念都没有
欢迎来到华新中文网,踊跃发帖是支持我们的最好方法!原文 / 传统版 / WAP版所有回复从这里展开收起列表
论坛导航 -> 华新鲜事 -> 房产车市 | 返回上一页 | 本主题共有 2 篇文章,分 1 页, 当前显示第 1 页 | 回到顶部
<<始页  [1]  末页>>

请登录后回复:帐号   密码